its likely to continue to be high pings upto first week of may if a pakistani noc e-mail is to be believed. I have seen the mail on the site of a lahore based internet provider which states that TE North cable(mediterranian part of SEACOM is called te north) will be repaired till 28th apr and then work will start on SE-ME-WEA 4 cable. Its an irony that only subsea cable parttly owned by BSNL that is EIG cable has been repaired on 17th apr but no improvement in pings has been seen on european route. seems corruption has taken its toll again means BSNL is not using its own cables instead rented ones are used.Our media is also silent about this cable outage,look at pakistan's, they are reporting everything on a regular basis and their state run company PTCL was also issuing updates. One thing strange is that PTCL partly owns three subsea cables where as BSNL which is a giant in comparison only has one.shame on BSNL.
 
Here is the copy of that e-mail which gives some idea about tthe current woes of internet in Indian subcontinent.
Dear All,
The latest update the SMW-4 segment repair will take more time it might go into May. Here is the email that I have received from NOC directly.
Please find below the latest update on SMW4 as on 15th April '13
Repair update on SMW4 cable fault in Alexandria - Marseilles
Cable ship Mobilization
1. Cable Ship is being mobilized by Telecom Egypt.
2. Currently the ship is engaged in EIG repair, this may go up to 17th April.
3. After the EIG, the ship will be repairing TE NOrth cable
4. TE north cable repair work expected to complete by 27th April
5. SMW4 repair will start around 28th April.
6. Since the cable is damaged very close to shore, at about 700 mts, the repair methods still not decided by the cable ship along with consortium O&M committee.
7. ERT will be announced once the MOP is decided.
Regards,
Sohail Qadir
--------------------------------------------------------------------------------
From: "Basit Farooq Alvi"
Sender: pakgrid@yahoogroups.com
Date: Mon, 15 Apr 2013 14:30:56 +0500
To:
ReplyTo: pakgrid@yahoogroups.com
Subject: [pakgrid] SMW4 Latest Update.
Dear All,

Mentioned below is the latest update received from SMW4 for your kind reference:

“SMW4 NOC informed that the master permit has been obtained. Currently awaiting for the operational permit. Based on the preliminary POW, cable ship “Rene Descartes” is expected to start the repair operation from 20 April and final splice on 26 April 2013.

The schedule date is tentative subject to the availability of the operational permit.”


*------------------------------------------------------------
Basit Farooq Alvi (Director)
Brain Telecommunication Limited
730-Nizam Block Allama Iqbal Town Lahore 54570 Pakistan
UAN: 111222888 D: +92-423-2100102 Cell: +92300-8451444
UK Landline: +44-178-5800102 Fax: +92-423-2101010
E: basit@... W: www.brain.pk t: @bpk69
 
Monsoon has started here in Guwahati and the lines are back to terrible once again. The pages are crawling on a UL 1800 plan which should get 2 mbps speed. Even speedtest.net is failing to load up the configuration file. Pages open up part by part and youtube videos hardly even buffer. When will BSNL bucken up its belts. BSNL broadband is terrible almost all the year round due to one reason or the other.
 
Monsoon ? Monsoon hasn't hit Kerala coast yet. It will take another 30 days. It must be summer rain.
 
I don't think it has been fixed.
I am still having issues playing any game to international servers.
 