testsubjectalpha
Regular
oop. that should've read 'carved'. damn, 's' and 'd' being right next to each other...
[/quote]Originally posted by ultra vires@Feb 16 2006, 03:11 AM
k .. i was away .. and now back with news
there dslam is the bottleneck.
........
no they are not layin more wires to get more capacity.
yes they are upgrading there netwrk(DSLAM and fibre).
[snapback]42165[/snapback]
[/quote]Originally posted by ultra vires@Feb 16 2006, 03:28 PM
who care wht geramar is..
wht purpose would these vertical holes server , unless they want to dig there Customer care executives
[snapback]42216[/snapback]
[/quote]Originally posted by testsubjectalpha@Feb 16 2006, 10:36 AM
(ultra, 'their' and not 'there' (in some cases))
airtel's "laying" wires, but in a different way. since the trench work got done the last time they carves up the footpaths and the roads, now, they're digging vertically (down) and not horizontally. a hole, 5ft by 5ft maybe is made every 20 metres, and more cable fitted into their existing pipes. but i've only seen this in green park and hauz khas...
[snapback]42180[/snapback]