Last edited by a moderator:
even for ambani dealing with last mile connectivity issues (permissions, bribes) is a major PITA and i assumed this was the idea behind acquiring hathway/den ...airtel realised this too and went ahead with lco model for tier 2-3 cities/towns and look at their pace of expansion now it's a win win for both airtel and the lco ...my fear is when airtel sees the huge reduction in OPEX they might shift to the lco model completely even in tier 1 citiesI don't think so because jio likes to control their environment and I don't think that this is is achievable through LCO , but I do believe that jio has the capacity and intent to go Pan India soon
How does it matter ? Lol. We need to stop micro scrutinizing every word.Has anyone noticed, the point in the terms and conditions regarding the FUP limit of 3300 GB, has been shifted to the end? Initially it was the first point mentioned. These are the terms on the Jio Fiber website, not in MyJio app. Initially, I thought they had removed this point, but on seeing till the end, it was the last point mentioned.